No: | Project Name | Employer | Project Cost | Contract Year |
100 | DRINKING WATER IN SİVRİHİSAR DISTRICT AND VARIOUS NEIGHBORHOOD CONSTRUCTION | Eskişehir Metropolitan Municipality General Directorate of Water and Sewerage Administration | $2.462.074 | 2018 |
99 | YENİKENT AND İNEGÖL SOLID WASTE STORAGE AREA ARRANGEMENT CONSTRUCTION WORK. | BURSA METROPOLITAN MUNICIPALITY | $1.982.338 | 2017 |
98 | KOCAELİ PROVINCE İZMİT DISTRICT DRINKING WATER SEWERAGE AND REPAIR AND RENEWAL CONSTRUCTION OF RAINWATER LINES | General Directorate of Kocaeli Water and Sewerage Administration | $4.537.231 | 2017 |
97 | KARTEPE DISTRICT IS ON VARIOUS STREETS AND STREETS DRINKING WATER, SEWERAGE, RAINWATER AND STREAM TREATMENT CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $4.225.243 | 2018 |
96 | 2017 COMPANIES 1. MISCELLANEOUS AFFILIATED TO THE REGIONAL DIRECTORATE LAYING OF DRINKING WATER NETWORK IN DISTRICTS AND NEIGHBORS AND DOMESTIC CONNECTIONS | Bursa Water and Sewerage Administration | $878.511 | 2017 |
95 | YEŞİLDERE 1800 MM POTABLE WATER TRANSMISSION LINE CONSTRUCTION WORK | General Directorate of İzmir Water and Sewerage Administration | $876.014 | 2017 |
94 | YILDIRIM BEYAZIT NEIGHBORHOOD - BAGDAT STREET ROUTE SEWERAGE COLLECTOR LINE CONSTRUCTION | Kayseri Metropolitan Municipality General Directorate of Water and Sewerage Administration | $5.454.545 | 2017 |
93 | BURSA İNEGÖL AREA POND IRRIGATION CONSTRUCTION | STATE HYDRAULIC WORKS | $1.263.003 | 2017 |
92 | İZMİR PROVINCE MENEMEN DISTRICT TÜRKELLİ WASTEWATER TREATMENT PLANT İKMAL İNŞAAT | General Directorate of İzmir Water and Sewerage Administration | $2.325.862 | 2016 |
91 | 2016/5 MUSTAFAKEMALPAŞA (BURSA) SEWERAGE AND RAIN WATER CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $2.355.002 | 2016 |
90 | 2016 MUDANYA (BURSA) DISTRICT INFRASTRUCTURE MAINTENANCE AND REPAIR CONSTRUCTION BUSINESS | Bursa Water and Sewerage Administration | $1.476.027 | 2016 |
89 | 2016/4 BURSA POTABLE WATER TRANSMISSION IN VARIOUS NEIGHBORHOOD LINE CONSTRUCTION CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $2.193.895 | 2016 |
88 | CONTRACT NO: A3.2 GEMLİK GULF (BURSA) RAIN WATER AND SEWERAGE DRAINAGE WORK (EUROPEAN YATIRIM BANKASI CREDIT - SHARE RATIO: 50%)CONTRACT |
Bursa Water and Sewerage Administration | $41.268.770 | 2014 |
87 | SEWERAGE IN IZNIK DISTRICT CENTRAL DISTRICTS DOMESTIC CONNECTION CONSTRUCTION | Bursa Water and Sewerage Administration | $326.877 | 2016 |
86 | SEWERAGE IN THE CENTRAL NEIGHBORHOOD OF YENİŞEHİR DISTRICT DOMESTIC CONNECTION CONSTRUCTION | Bursa Water and Sewerage Administration | $327.962 | 2016 |
85 | HISTORY OF BURSA METROPOLITAN MUNICIPALITY INCLUDING BORDERS MAINTENANCE AND REPAIR WORKS OF QUALITY FOUNTAINS | BURSA METROPOLITAN MUNICIPALITY | $323.799 | 2015 |
84 | MAINTENANCE-REPAIR, BURSA B. CITY MUNICIPALITY, MUDANYA, KARACABEY, M.KEMALPAŞA, ORHANELİ, BÜYÜKORHAN, KELES, HARMANCIK HISTORICAL VALUE AND QUALITY IN ITS DISTRICTS | BURSA METROPOLITANMUNICIPALITY | $877.274 | 2015 |
83 | 2015/1 BUSKI CENTRAL RAINWATER GRILLS AND GRILL CLEANING OF CONNECTION LINES SERVICE PROCUREMENT | Bursa Water and Sewerage Administration | $389.247 | 2015 |
82 | 2014/3 VARIOUS VILLAGE STORAGES AND PROMOTION STATIONS (FROM NİLÜFER-ÇINARCIK DAM TO VARIOUS NEIGHBORS) CONSTRUCTION BUSINESS | Bursa Water and Sewerage Administration | $2.012.976 | 2015 |
81 | İZMİR PROVINCE FOÇA DISTRICT YENİFOÇA WASTEWATER TREATMENT PLANT CONSTRUCTION | General Directorate of İzmir Water and Sewerage Administration | $3.555.556 | 2015 |
80 | OSMANGAZİ REGION 1 SEWERAGE AND RAIN WATER CONSTRUCTION (CONTRACT NO: 2015/1) WORK | Bursa Water and Sewerage Administration | $2.346.361 | 2015 |
79 | NİLÜFER 1st REGION SEWERAGE AND RAIN WATER CONSTRUCTION (CONTRACT NO: 2015/5) WORK | Bursa Water and Sewerage Administration | $2.843.601 | 2015 |
78 | YENİŞEHİR AND İZNİK (BURSA) SEWERAGE AND RAIN WATER CONSTRUCTION (CONTRACT NO: 2015/9) WORK | Bursa Water and Sewerage Administration | $3.774.296 | 2015 |
77 | 2015-1 PARQUET FLOORING IN VARIOUS DISTRICTS BUSINESS2015-1 PARQUET FLOORING IN VARIOUS DISTRICTS |
Bursa Water and Sewerage Administration | $552.295 | 2015 |
76 | ANTALYA (CENTRAL) SEWERAGE PROJECT, EXPO 2016 LARA WASTEWATER TREATMENT PLANT WITH ANTALYA EXHIBITION AREA |
General Directorate of İzmir Water and Sewerage Administration | $374.216 | 2015 |
75 | GEMLİK-UMURBEY SEWERAGE AND RAIN WATER CONSTRUCTION HEAT | Bursa Water and Sewerage Administration | $1.059.508 | 2015 |
74 | ANTALYA (CENTRAL) SEWERAGE PROJECT, EXPO 2016 LARA WASTEWATER TREATMENT PLANT WITH ANTALYA EXHIBITION AREA | EXPO 2016 ANTALYAAGENCY | $11.172.751 | 2014 |
73 | OSMANGAZİ (BURSA) 5th REGION SEWERAGE AND RAIN WATER CONSTRUCTION | Bursa Water and Sewerage Administration | $1.456.030 | 2014 |
72 | GÖLCÜK SIRETİYE POTABLE WATER TREATMENT PLANT AND TRANSMISSION LINES CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $2.320.003 | 2014 |
71 | KOCAELİ PROVINCE ARSLANBEY AND SUADİYE REGIONS WATER WELLS CONNECTION LINES BETWEEN AND COLLECTOR LINES | General Directorate of Kocaeli Water and Sewerage Administration | $1.133.276 | 2014 |
70 | ORHANGAZİ (BURSA) MUNICIPALITY RAIN WATER CONSTRUCTION (JICA CREDIT) | BANK OF PROVİNCES | $3.916.336 | 2013 |
69 | IRMAK-ZONGULDAK-KARABÜK RAILWAY LINE IMPROVEMENT AND SIGNALIZATION WORKIRMAK-ZONGULDAK-KARABÜK RAILWAY LINE |
BUILDING CENTER MÖN NAME PARTNERSHIP | $4.722.222 | 2013 |
68 | HORIZONTAL DRILLING WITH HORIZONTAL DRILLING PASSING WITH 1000 MM STEEL PIPE and 800 MM HDPE WITHIN PIPE LAYING | BURSA / İNEGÖL MUNICIPALITY | $138.889 | 2013 |
67 | ORHANGAZİ (BURSA) MUNICIPALITY SEWERAGE CONSTRUCTION (JICA CREDIT) | BANK OF PROVİNCES | $6.910.183 | 2013 |
66 | 2012/2 CONSTRUCTION OF TRANSMISSION LINES IN VARIOUS NEIGHBORHOOD CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $1.428.778 | 2013 |
65 | POTABLE WATER TANKS IN VARIOUS DISTRICTS OF KOCAELİ BUILD | General Directorate of Kocaeli Water and Sewerage Administration | $1.272.222 | 2012 |
64 | 2012/1 CONSTRUCTION OF TRANSMISSION LINES IN VARIOUS NEIGHBORHOOD and DISPLACEMENT CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $938.356 | 2012 |
63 | GEMLİK RAINWATER PREPARATION ROOM CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $511.111 | 2012 |
62 | BANDIRMA INDUSTRIAL ZONE SEWERAGE, RAIN WATER LINES, HEATING CENTER and PUMPING LINES | BANDIRMA MUNICIPALITY | $1.008.333 | 2012 |
61 | SEWERAGE AND RAIN WATER OF YILDIRIM DISTRICT CONSTRUCTION (Contract No: 2012/01) CONSTRUCTION WORKSEWERAGE AND RAIN WATER OF YILDIRIM DISTRICT |
Bursa Water and Sewerage Administration | $886.003 | 2012 |
60 | KANDRA NAMAZGAH DAM DRINKING WATER TREATMENT PLANT KANDRA CENTRAL POTABLE WATER SUPPLY PROJECT - 2. STAGE CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $1.554.462 | 2012 |
59 | İNEGÖL MUNICIPALITY SEVİM YILDIZ CAMPUS RAIN WATER AND SEWERAGE DRAIN LINE AND LANDS BACK SEWERAGE NETWORK LAYOUT CONSTRUCTION WORK | BURSA / İNEGÖL MUNICIPALITY | $532.450 | 2012 |
58 | GEBZE-ORHANGAZİ-İZMİR MOTORWAY ALL INFRASTRUCTURE LINES TRANSMISSIONS CONSTRUCTION WORK | HIGHWAYS GEN. MÜD / OTOYOL A.Ş. / NÖMAYG / MAKYOL-MIGRATION | $1.000.000 | 2012 |
57 | REHABILITATION OF HISTORICAL WATER STRUCTURES (FOUNTAINS) | Bursa Water and Sewerage Administration | $730.605 | 2011 |
56 | KANDRA CENTRAL POTABLE WATER AND SEWERAGE CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $5.154.395 | 2011 |
55 | GEMLİK-UMURBEY WASTEWATER AND RAINWATER CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $3.668.663 | 2011 |
54 | 2011/1 BUSKI CENTER SEWERAGE, RAIN WATER BLOOD WITH MAINTENANCE, REPAIR AND FAULTS OF ITS LINES. HOME BOND. CONSTRUCTION WORK2011/1 BUSKI CENTER SEWERAGE, RAIN WATER |
Bursa Water and Sewerage Administration | $1.772.579 | 2011 |
53 | STREET-STREETS WITHIN THE DISTRICT BORDERS OF MUDANYA CONSTRUCTION OF TRETUVAR AND ROAD ARRANGEMENT CONSTRUCTION WORK | MUDANYA MUNICIPALITY | $327.528 | 2011 |
52 | NEW SÖLÖZ (BURSA) DRINKING WATER CONSTRUCTION WORK | ILLER BANK | $164.443 | 2011 |
51 | (2010) MUDANYA BRANCH OFFICE INFRASTRUCTURE MAINTENANCE AND REPAIR CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $1.390.844 | 2010 |
50 | BRUSH, BOARD, AND SPREAD SEWERAGE AND RAIN WATER INS | Bursa Water and Sewerage Administration | $1.978.086 | 2010 |
49 | SEWERAGE LINE CONSTRUCTION | YENİŞEHİR MUNICIPALITY | $327.528 | 2010 |
48 | PARQUET STONE ROAD CONSTRUCTION TO INDUSTRIAL | YENİŞEHİR MUNICIPALITY | $223.808 | 2011 |
47 | ERDEK ALAATTİN ATATÜRK, THE ROAD IN THE NEIGHBORHOOD OF YALI ROAD AND TRETUVAR CONSTRUCTION IN NON-PRESENT AREAS | ERDEK MUNICIPALITY | $287.528 | 2011 |
46 | KURTULUŞ MAH. TO VARIOUS STREETS AND STREETS SEWERAGE AND RAINWATER LINE CONSTRUCTION | YENİŞEHİR MUNICIPALITY | $152.080 | 2011 |
45 | INDUSTRIAL ZONES IN THE NORTH OF DILOVASI AND VILLAGES NEAR ISU SUPPLY CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $5.004.424 | 2010 |
44 | GEBZE KORKAKDERE UPPER SECTION STREAM RECOVERY CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $913.949 | 2009 |
43 | GEBZE TANK CONNECTIONS CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $1.159.035 | 2009 |
42 | GEBZE KORKAKDERE (III. PART) RECOVERY CONSTRUCTION | General Directorate of Kocaeli Water and Sewerage Administration | $598.725 | 2009 |
41 | BUSKİ OSMANGAZİ, NİLÜFER AND YILDIRIM DISTRICT WASTEWATER AND MONITORING RAINWATER LINES AND CLEANING | Bursa Water and Sewerage Administration | $318.121 | 2009 |
40 | BURSA-KARACABEY-ARIZ-DOĞLA LAKE IRRIGATION PLANT CONSTRUCTION | Bursa Water and Sewerage Administration | $1.041.691 | 2009 |
39 | BUSKI YILDIRIM DISTRICT DOMESTIC CONNECTION CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $495.832 | 2009 |
38 | KÜÇÜKKUYU SEWERAGE CONSTRUCTION | KÜÇÜKKUYU MUNICIPALITY | $2.687.802 | 2009 |
37 | 2008/1 TRANSMISSION LINES CONSTRUCTION IN VARIOUS NEIGHBORHOOD | Bursa Water and Sewerage Administration | $1.367.518 | 2009 |
36 | ÇİĞDEM ALTI EYLÜL GÜNEŞ VE PİRİATEŞ SK. TRETUVAR AND ROAD CONSTRUCTION WORK | YENİŞEHİR MUNICIPALITY | $200.987 | 2009 |
35 | STONE PARQUET TO TÜFEKÇİ AVENUE, HONOR AND FLOWER ROAD CONSTRUCTION | YENİŞEHİR MUNICIPALITY | $256.289 | 2009 |
34 | MISCELLANEOUS WITHIN THE BORDERS OF YILDIRIM MUNICIPALITY BORDER AND TRETUVAR CONSTRUCTION WORK IN THE DISTRICTS | YILDIRIM MUNICIPALITY | $486.520 | 2009 |
33 | PANJIN PARK FILLING AREA AND EASTERN COAST BAND MAKING RAINWATER CHANNEL | YALOVA MUNICIPALITY | $187.297 | 2008 |
32 | VARIOUS STREETS IN GEMLIK DISTRICT BORDERS AND CONCRETE FLOORING AND BORDER LAYING OF THE STREETS | GEMLİK MUNICIPALITY | $558.431 | 2008 |
31 | SEWING IN VARIOUS DIAMETERS CLEANING, IMAGING, INSPECTION CHIMNEY UPGRADE AND NEW MAKING INSPECTION CHIMNEY | KAYSERİ WATER AND SEWERAGE ADMINISTRATION GENERAL DIRECTORATE | $277.153 | 2008 |
30 | ATAKENT AND HATIP STREETS TRETUVAR AND ROAD CONSTRUCTION WORK | YENİŞEHİR MUNICIPALITY | $259.616 | 2008 |
29 | TABİAT CAD. ANATOLIAN HIGH SCHOOL ROAD PARKING ROAD CONSTRUCTION WORK | YENİŞEHİR MUNICIPALITY | $200.400 | 2008 |
28 | NEW MAHALLE AKDERE CAD. TRETUVAR AND ROAD CONSTRUCTION WORK | YENİŞEHİR MUNICIPALITY | $163.432 | 2008 |
27 | MOLLA GÜRANI, İVAZPAŞA AND MUH. MAH. SEWERAGE AND RAIN WATER CONSTRUCTION | YENİŞEHİR MUNICIPALITY | $439.885 | 2008 |
26 | İSTİKLAL MAH. Ş.M KAYA CAD. ROAD ARRANGEMENT WORK | Bursa Water and Sewerage Administration | $469.824 | 2008 |
25 | OSMANEFENDİ MAH. PEDESTRIAN WORK | Bursa Water and Sewerage Administration | $216.291 | 2008 |
24 | BURSA İZNİK AYDINLAR VILLAGE NATURAL TREATMENT CONSTRUCTION | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $155.297 | 2008 |
23 | BURSA OSMANGAZİ BÜYÜKDELİLLER KÖYÜ IRRIGATION TES. CONSTRUCTION | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $190.201 | 2008 |
22 | NATURAL TREATMENT CONSTRUCTION IN BURSA ORHANGAZİ ÜREĞİL VILLAGE | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $187.511 | 2008 |
21 | BURSA İNEGÖL ALİBEYKÖY IRRIGATION PLANT PROJECT | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $286.857 | 2008 |
20 | BURSA ORHANGAZİ ÖRNEK KÖYÜ FOS. AND NATURAL TREATMENT CONSTRUCTION | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $186.290 | 2008 |
19 | NATURAL TREATMENT CONSTRUCTION IN BURSA ORHANGAZİ AKHAREM VILLAGE | BURSA SPECIAL PROVINCIAL ADMINISTRATION | $110.952 | 2008 |
18 | BAHÇECİK-YUVACIK-KARŞIYAKA BAĞ.YOLU İÇM.KAN.ŞAATI | General Directorate of Kocaeli Water and Sewerage Administration | $1.041.825 | 2008 |
17 | DEEP WATER POTABLE WATER TRANSMISSION LINES CONSTRUCTION (PACKAGE 3) CONSTRUCTION WORK | Bursa Water and Sewerage Administration | $529.137 | 2008 |
16 | GÜLLÜK WASTEWATER TREATMENT PLANT CONSTRUCTION (CONSTRUCTION WORKS) | Bursa Water and Sewerage Administration | $506.104 | 2007 |
15 | BURKAN 20 / D SEWAGE AND RAINWATER DRAINAGE WORKS | Bursa Water and Sewerage Administration | $1.000.000 | 2007 |
14 | GÜLLÜK DRINKING WATER AND WATER TANKS CONSTRUCTION WORK | TASK SU AND SEWERAGE INVESTMENT | $1.310.359 | 2006 |
13 | BURKAN 9 SEWAGE AND RAINWATER DRAINAGE WORKS | Bursa Water and Sewerage Administration | $3.752.107 | 2004 |
12 | BURKAN 6 RAINWATER AND DRAINAGE WORKS | Bursa Water and Sewerage Administration | $9.324.587 | 2003 |
11 | SEWERAGE AND RAIN WATER IN VARIOUS NEIGHBORHOOD CONSTRUCTION 2002/11 | Bursa Water and Sewerage Administration | $741.368 | 2002 |
10 | WASTEWATER TREATMENT PLANT CONSTRUCTION (CONSTRUCTION WORKS) | Bursa Water and Sewerage Administration | $278.864 | 2001 |
9 | Sewage work | Bursa Water and Sewerage Administration | $825.160 | 2002 |
8 | WATER TANK CONSTRUCTION (10.000M3 CAPACITY) | Bursa Water and Sewerage Administration | $925.390 | 2001 |
7 | Sewerage construction under BURKAN | Bursa Water and Sewerage Administration | $1.332.712 | 2001 |
6 | BURSA LIGHT RAIL SYSTEM 1ST STAGE CONSTRUCTION WORKS INFRASTRUCTURE TRANSFER | GURIS HOLDING | $1.001.677 | 1999 |
5 | BURSA WATER AND CONVENTIONAL WATER SUPPLY AND CHANNEL | Bursa Water and Sewerage Administration | $3.161.571 | 1997 |
4 | DRINKING WATER NETWORK AND NEW NETWORK CONSTRUCTION | Bursa Water and Sewerage Administration | $2.428.874 | 1997 |
3 | ÇANAKKALE CENTRAL DRINKING WATER CONSTRUCTION | İLLER BANK | $1.640.987 | 1997 |
2 | ÇANAKKALE GELİBOLU DRINKING WATER CONSTRUCTION | İLLER BANK | $1.178.633 | 1994 |
1 | DRINKING WATER DISTRIBUTION LINE PROJECT | AKFEN HOLDİNG | $3.568.249 | 1193 |